Clugston

Paul Johnson IT Infrastructure Manager Clugston Construction Ltd

After several years of issues when trying to get comms onto construction sites at site setup stage we finally came across UK Connect.

BT Delays combined with old IT equipment trying to utilise 4G technologies had left us as an IT team and site commissioning teams frustrated at the amount of time it takes to get much needed Internet Access onsite from Day 1.

After a brief meeting with UK Connect’s Karen and PJ, we soon realised the potential of using their Site Connect option.

Two weeks later that solution was been installed on one of our construction sites that was both struggling to get a BT connection and having reliability issues with our 4G solution.

A pain free 1 hour expert onsite installation and the site were up and running getting speeds 5 times faster than what BT could offer.

We have since rolled this same solution out to two further sites and have been praised for both the quickness of install and the ongoing performance increase sites have been getting from having the SiteConnect solution in place.

I would just like to personally thank PJ, Karen, site installation engineer Ian and the rest of the UK Connect team for their ability to provide a solution not only on paper but out on live construction sites so quickly and professionally.

Paul Johnson

IT Infrastructure Manager | Clugston Construction Ltd